Website by Barques

News

Development progresses at iPort, Doncaster
30Jun2015

Development progresses at iPort, Doncaster

Work is continuing apace at iPort, to complete the £21million infrastructure works that facilitate Verdion’s 6 million sq ft (570,000 sq m) iPort development in Doncaster.

Verdion is on site undertaking the site levelling, surcharging works and installing the estate roads within the 337 acre (136 hectare) rail-connected scheme. These works create an ‘oven-ready’ plateaux for the delivery of the built-to-suit and new speculative warehouse units ranging from 50,000 sq ft (4,645 sq m) to 1.2 million sq ft (111,524 s m).

John Clements, Verdion’s European Development Director, says: “The aerial photos really demonstrate just how far the site has come and give a good indication of the scale of the development. We have strong interest in the site and expect to be able to announce our first occupier in the next couple of months.”

iPort has outline planning consent for 6 million sq ft (570,000 sq m) and reserved matters consent for 3 million sq ft (280,000 sq) of Grade A logistics warehousing. The scheme will be linked with a high specification rail freight intermodal container facility, providing rail freight services with continental gauge clearance to all major UK ports and the Channel Tunnel.

As well built-to-suit opportunities, due to confidence in the scheme and in the market, Verdion has now started the development of two new warehouse units of 215,000 sq ft (19,973 sq m) and 130,000 sq ft (12,077sq m). The Grade A warehouse space will be specified to suit multiple user requirements with expansion potential to double both units’ initial floor area. The buildings will be constructed simultaneously and are scheduled for completion in Q1 2016.

iPort is linked with Junction 3 of the M18 via the Finningley and Rossington Regeneration Route Scheme (FARRRS).

Gent Visick, CBRE and Cushman & Wakefield are letting agents for iPort.

For more images of site progress, click here.

Recent Posts

10Oct2017
iPort – Multi-Award Winner 2017

iPort – Multi-Award Winner 2017

Verdion’s 6 million sq ft (557,000 sq m) multi-modal logistics scheme in Doncaster is now a…

Read More
08Sep2017
Verdion reaches shortlist for Yorkshire Post Excellence in Business Awards 2017

Verdion reaches shortlist for Yorkshire Post Excellence in Business Awards 2017

Verdion has reached the shortlist for the Yorkshire Post’s 2017 Excellence in Business Awards, in the category of…

Read More
01Sep2017
Lidl starts construction of new RDC at iPort

Lidl starts construction of new RDC at iPort

Construction of Lidl’s new £70m Regional Distribution Centre has now commenced at iPort. Lidl is working…

Read More